Foundation and Ground Improvement Value Engineering
The Utorgu gas field in Delta state is the site of the second largest gas gathering and processing facility for the supply of natural gas to the Nigerian domestic market.
Viridi was heavily involved with one of the bidders at the tender stage to review the foundation’s design for the various equipment in the Utorogu Gas Plant Expansion Project.
The analysis included recommendations and design for the required ground improvement work. Our value engineering solution by utilising various ground improvement techniques under different load cases and ground conditions managed to offer a competitive advantage to our client in terms of cost, duration and carbon footprint.